Pharmaceutical

  • Shutdown work in Streile OPS 2
  • Floor Scales and Clean Room Fitout in OPS 2
  • Recreation Area off Canteen
  • BBcEx Lab OPS 2
  • Lab 148-150 refurbishment
  • Lab 196 refurbishment
  • Structural Platform over Lab 150 for new AHU
  • Main Carpark Extension
  • Access Link Corridor
  • Structural Platform over Plant Room 116v for AHU
  • Site Roadway repairs
  • Administration Building Offices
  • Lift Staft Works Admin Building
  • Bund Repairs
  • Micro Lab Renewal
  • General Site Maintenance.
  • Pre Phase 2 AHU Platform on roof of OPS 1
  • OPS 1 CS&C Upgrade (New Build)
  • OPS 2 Equipment Store
  • Installation of New Oil Interceptors
  • Site Wide Drainage Repairs
  • Pedestrian Crossing Upgrade
  • Contractors Compound Upgrades
  • CHP Civils Works
  • OPS 2 Cabin Removal and reinstatement of OPS 2 building fabric
  • Site Wide Drainage Survey and testing
  • Process Manhole and Line Replacement (Double Contained SS)
  • Process Waste Pipe Re-lining

 

  • Boiler House Extension and Calibration Workshop Construction
  • Floor alterations and roof openings for Vessel Instalment

Schering Plough

  • Shering Plough is now under the MSD brand (see above)

Ipsen

  • Roof Repairs on their facility in Blanchardstown
  • Bund Repairs in Blanchardstown

Johnson Controls

  • Audit Preperation Works
  • General Site Maintenance

Jacobs

  • Access Link Corridor OPS 1n Facility Suite 3 Brinny
  • Carpark Works in Brinny