Pharmaceutical

- Shutdown work in Streile OPS 2
- Floor Scales and Clean Room Fitout in OPS 2
- Recreation Area off Canteen
- BBcEx Lab OPS 2
- Lab 148-150 refurbishment
- Lab 196 refurbishment
- Structural Platform over Lab 150 for new AHU
- Main Carpark Extension
- Access Link Corridor
- Structural Platform over Plant Room 116v for AHU
- Site Roadway repairs
- Administration Building Offices
- Lift Staft Works Admin Building
- Bund Repairs
- Micro Lab Renewal
- General Site Maintenance.
- Pre Phase 2 AHU Platform on roof of OPS 1
- OPS 1 CS&C Upgrade (New Build)
- OPS 2 Equipment Store
- Installation of New Oil Interceptors
- Site Wide Drainage Repairs
- Pedestrian Crossing Upgrade
- Contractors Compound Upgrades
- CHP Civils Works
- OPS 2 Cabin Removal and reinstatement of OPS 2 building fabric
- Site Wide Drainage Survey and testing
- Process Manhole and Line Replacement (Double Contained SS)
- Process Waste Pipe Re-lining

- Boiler House Extension and Calibration Workshop Construction
- Floor alterations and roof openings for Vessel Instalment

- Shering Plough is now under the MSD brand (see above)

- Roof Repairs on their facility in Blanchardstown
- Bund Repairs in Blanchardstown

- Audit Preperation Works
- General Site Maintenance

- Access Link Corridor OPS 1n Facility Suite 3 Brinny
- Carpark Works in Brinny